Hey, everybody, 

The work I would like to share with you today is: Henley(Henley Environmental Technology Group) commissioned zmake to design a reception area A total of 1000 square meters, 

divided into three layers, 

Today's share is a layer of 350 square meters This project is still shared as follows: zmake covers the whole process from planning, design, construction, procurement, soft furnishings 

to delivery. 



Remote EPC in the field also presents new challenges for us, We've made a few minor upgrades for this project delivery, Share below: 

① : In order to facilitate the owner's later use and maintenance, we made a space manual for the first time 

② : We provide exclusive music, fragrance, and small custom logo for the space 

③ : When delivered, we also match cotton swabs, combs, hand cream, wet tissue, convenient for the owner to use

④ : We provide the owners with tea sets, as well as dining utensils, including placemats, water cups, and paper towels 





In the EPC concept, We still think of the Henley Reception as a good looking reception product, 

Under the constraints of the three dimensions of product time, cost and target effect, the implementation can be achieved. 


Spatially, we adopted a central axis layout. Because this way can increase the rhythm of the space, at the same time, the retraction and dynamic relationship can be better reflected. 

In this project, many soft decoration furnishing products were designed, polished, produced and finally put into space use by ourselves. 

For example, you can see the stove, wall cabinet, art, food preparation cabinet, and some documents in the space.  


In addition, bamboo is also used in the space design element. The only difference is that in the past, we used to hire a professional bamboo weaver to make bamboo. 

And this time we try to break down the complex bamboo weaving process into the simplest way, so that non-professional teachers can also make it .


 

The overall time and cost control of this project has reached the expected level. Are within the ideal range,

On the day of final delivery, Many members of Party A's team participated in the delivery ceremony. After the end, our internal team did a 2-hour on-site review and self-summary.


 